Use this UPPCL New Connection Cost Calculator 2026 to estimate the current processing fee and security for a new domestic or commercial connection, then add the metering and supply-affording amounts shown in your Jhatpat estimate.
UPPCL New Connection Cost Calculator 2026
UPPCL New Connection Charges in 2026
The 2026 Cost Data Book separates the amount into processing fee, security, metering charge and supply-affording charge. Processing fees start at ₹25 for eligible lifeline load up to 1 kW, ₹200 for 1-2 kW, ₹300 for 3-4 kW, ₹500 for 5-24 kW and ₹5,000 for 25-50 kW.
Security is category-specific. Lifeline up to 1 kW is nil. Rural domestic up to 2 kW is ₹100 per kW, urban domestic up to 2 kW is ₹300 per kW, domestic above 2 kW is ₹400 per kW, and LMV-2 commercial is ₹1,000 per kW.
Why Metering and Supply Charges Are Manual
These amounts depend on phase, distance, network arrangement and the official estimate. The 2026 rules also provide installment recovery for some single-phase smart-meter costs. Enter the exact figures displayed by Jhatpat or the DISCOM estimate rather than using an invented flat number.
Apply through the official Jhatpat portal and compare the final estimate before payment.